Excavation, land clearing, septic and site work across Casa Grande, Maricopa, Coolidge and Eloy(520) 423-3763
Casa GrandeExcavation & Site Work Call now
Menu

Grading sets how water moves across a lot: away from the house, off a pad, into a basin or along a swale. On larger parcels around Casa Grande, it can also trigger a state stormwater permit.

Yellow motor grader working beside a tall bank of red earth
A motor grader finishing a graded surface. Stock photo: paulbr75 / Pixabay, Pixabay Content License.

ADEQ's Construction General Permit

The 2025 Construction General Permit (AZG2025-001), in effect since August 29, 2025, covers stormwater discharges to protected surface waters or a municipal storm sewer system from construction that disturbs 1 acre or more, or a smaller site that's part of a larger common plan that will. The steps:

  1. Write the SWPPP.ADEQ says the stormwater pollution prevention plan must be done before the Notice of Intent.
  2. File the NOI.Submitted through ADEQ's myDEQ portal.
  3. Pay the fees.Application fees depend on acres disturbed, with annual fees in the anniversary month.

Dust

Pinal County wants a site permit application, site plan and dust control plan for development of 0.1 acre or more before construction begins.

Costs

Angi's Phoenix-area guide, the nearest published metro figures, lists grading and leveling at $415 to $6,720, leveling at $5 to $15 per cubic yard and hauling at $10 to $30 per cubic yard. Angi's national guide adds land surveys at $400 to $550 and soil testing at $700 to $2,200.

Check the ground

Earth fissures can act as a conduit for runoff, and monsoon rain can quickly widen them, per the Arizona Geological Survey. Before shaping drainage on a parcel, check for mapped fissures nearby. See earth fissures.

Yellow motor grader parked on grass
Graders are the finishing tool for pads, drives and swales. Stock photo: dimitrisvetsikas1969 / Pixabay, Pixabay Content License.

Questions and answers

When do I need ADEQ's stormwater permit for grading?

When construction disturbs 1 acre or more (or is part of a larger common plan that will) and discharges to protected surface water or a municipal storm sewer system. A SWPPP comes first, then a Notice of Intent through myDEQ.

Get your grading quoted

Give us a call or send the form, and a contractor who works in western Pinal County will get back to you. Quotes are free.

Call (520) 423-3763

On voicemail, leave your name, number, where the property is and the job you have in mind.

Get an excavation quote

A local contractor receives your request and contacts you. Privacy